Simpler: Parts, steps and assembly are a simple and easy cycle. Even unskilled workers can do the job.
Faster: Complete construction of building typically takes 4-5 days. Projects can be scheduled at anytime during the year because construction can be done in any season or climate.
Cheaper: High savings due to the speedy construction, lower material costs, lower labor cost and no heavy equipment required. This in turn allows for affordable housing projects.
Resilient: The buildings are safe and resilient because the steel reinforced concrete can withstand fire, tornadoes, floods, storms and hurricanes. Also in earthquake zones, these structures can be specially engineered for all seismic conditions.
Versatile: Formwork systems are modern and very versatile. They can be used for single and multi level buildings. They are designed to give optimum productivity, allowing for rapid construction of multiple structures.
How we work
We employ a standard methodology to identify the appropriate approach for each project and the unique vision it entails; it goes something like this:
Discovery: we learn about each client's unique vision, location and requirements.
Specifications: a detailed list of clients requests, specifications and goals is drafted for approval by client.
Options: Design team develops the different options and styles from clients vision.
Reports: Product team creates full report of supplies, inventory and prices
Planning: Construction team formulates a map work out for project steps
Contracts: Accounts team drafts relevant agreements/contracts
Begin the project with all partners planning and working closely together.